![]() |
|
||||||||||
![]() |
|
![]() |
|
|
|
||||||
![]() |
|
|
|
||||||||
|
|
|
|
|||||||||
|
|
|
|
|
||||||||
|
|
Projects |
|
|
|
|
||||||
|
|
|
||||||||||
|
|
|
||||||||||
|
Replacement and renewal of the sewage network in Homs
On 2004 Oyoun Al-Soud Center signed as subcontractors, a contract with General Company for Drinking Water and Irrigation (RIMA) to execute part of the project for replacement and renewal of the sewage network in Homs City. The contract included (but not limited to) execution of 11 cubic Km of sewers excavations, laying of concrete pipes with dimensions ranging from 500 to 1000 mm as well as renewal and replacement of manholes for the main network lines. The project works were finalized within the specified period with complete adherence to the specifications.
مشروع استبدال وتجديد شبكة الصرف الصحي في مدينة حمص في عام 2004 قام مركز عيون السود بتوقيع عقد من الباطن مع الشركة العامة للري ومياه الشرب ريما لتنفيذ جزء من أعمال مشروع استبدال وتجديد شبكة الصرف الصحي في مدينة حمص . ويتضمن العقد تنفيذ كمية 11كم3 من أعمال الحفريات للمجارير وتمديد القساطل الإسمنتية بأقطار 500 ملم ولغاية 1000 ملم وتجديد واستبدال و تركيب الريكارات للخطوط الرئيسية. وقد تم الانتهاء من تنفيذ أعمال العقد ضمن المدة المحددة وحسب المواصفات المطلوبة .
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|