Projects |
|
|
|
|
||||||
|
|
|
||||||||||
|
|
|
||||||||||
|
Execution of 20 Kv Connection between Jander Power Station and Hasya s substation
On 1993 Oyoun Al-Soud Center signed the contract of execution of connection between Jandar Gas Power stations and Hasya'a substation with General Directorate of Electricity in Homs City by construction of 20 KV overhead and underground transmission line of about 5 KM as well as construction of three outdoor substations with a capacity of 50 KVA, 100 KVA and 200 KVA . The project works included (but not limited to) excavation for towers and underground cables, erection of towers, laying of underground and overhead cables and conductors, as well as jointing works and the needed concrete works. The project works were finalized within the specified period with complete adherence to the specifications.
عقد تنفيذ خط كهربائي هوائي وأرضي جهد 20 ك.ف بين محطة تحويل حسياء ومحطة توليد جندر في حمص في عام 1993 قام مركز عيون السود بتوقيع عقد مع مديرية فرع كهرباء محافظة حمص لتنفيذ خط نقل جهد 20 ك ف للوصل بين محطة توليد جندر الغازية ومحطة تحويل حسياء، وذلك بإنشاء خط نقل هوائي و أرضي جهد 20 ك.ف بطول حوالي 5 كم ، بالإضافة إلى إنشاء ثلاث مراكز تحويل خارجية باستطاعة 50 ك.ف. آ، 100 ك.ف. آ و 200 ك.ف. آ. تتضمن أعمال المشروع تنفيذ حفريات الأبراج والكابلات الأرضية تثبيت الأبراج مد الكابلات الأرضية والأسلاك الهوائية بما في ذلك أعمال التوصيل للكابلات الأرضية والأسلاك الهوائية وصب الخرسانة اللازمة وقد تم الانتهاء من أعمال المشروع ضمن المدة المحددة وبالالتزام التام بالمواصفات المطلوبة.
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|