![]() |
|
||||||||||
![]() |
|
![]() |
|
|
|
||||||
![]() |
|
|
|
||||||||
|
|
|
|
|||||||||
|
|
|
|
|
||||||||
|
|
Projects |
|
|
|
|
||||||
|
|
|
||||||||||
|
|
|
||||||||||
|
Insulation works for walls and grounds in Sifco medical plant On 2002 Oyoun Al-Soud Center signed a contract with Sifco medical plant to execute the works of insulating the grounds and walls with Epoxy. The works included cleaning of the grounds- executing a base layer of Epoxy then many layers to reach total thickness of 1000 micron- cleaning the walls - executing a base layer of Epoxy with a thickness of 70 micron then finishing layer with a thickness of 150 micron twice. Oyoun Al-Soud Center also executed previously similar works in : Amessa Medical Plant (Mediotech) Water treatment Plants in Al-Ghab Sugar Factory and Homs Sugar Company- Food Plants of Ugharete Company in Jabla.
تنفيذ أعمال عزل الأرضيات والجدران في معمل سيفكو للصناعات الدوائية في عام 2002 قام مركز عيون السود بالتعاقد مع شركة سيفكو للمواد الدوائية لتنفيذ أعمال عزل الأرضيات والجدران بمادة الأيبوكسي، وقد تضمنت الأعمال تنظيف الأرضيات تنفيذ طبقة أساس من الإيبوكسي ثم تليها عدة طبقات للوصول إلى سماكة إجمالية 1000 ميكرون حف وتنظيف الجدران تنفيذ طبقة أساس بسماكة 70 ميكرون ثم طبقة نهائية بسماكة 150 ميكرون على وجهين. كما كان قد تم سابقا تنفيذ عدة أعمال مشابهة في كل من: معمل أدوية أميسا (ميديوتيك) محطات معالجة المياه في معمل سكر الغاب وشركة سكر حمص معامل مواد غذائية شركة أوغاريت في جبلة.
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|